royal-tower-3 service
royal-tower-3 service
royal-tower-3 service
royal-tower-3 service

Royal Tower 3

  • Date: 2025
  • Duration: Under Construction
  • Area: 10000 m2
  • Country: Saudi Arabia
  • City: Riyadh
  • Location: Show in google maps
  • Solutions Excuted:
  • Description:

    As part of the Royal Tower 3 Project, we executed Post-Tensioning Concrete works, including the supply of internationally certified equipment, installation of systems by specialized engineering teams to ensure precision and quality, and comprehensive technical supervision throughout all stages from design to final inspection. The works covered stressing and grouting operations under direct supervision, with continuous quality control tests and inspections to verify compliance with engineering standards. This project highlights our commitment to delivering advanced structural solutions that ensure efficiency, durability, and long-term performance for high-rise towers such as Royal Tower 3.

CONTACT