Al-Ahmari Hotel
- Date: 2024
- Duration: Under Construction
- Area: 12000 m2
- Country: Saudi Arabia
- City: Abha
- Location: Show in google maps
- Solutions Excuted:
- Description:
Post-tensioned slab works: design, supply, supervision and installation.
